2014 Renovations
0 1 2
Scoreboard - Old The old scoreboard being un-installed
0 0 8
Scoreboard - NEW! This new scoreboard is HUGE and it looks even bigger when standing next to it!
0 0 2
Scoreboard - New The new scoreboard was connected and working great. It was ready for the start of the 2014 spring season!
0 0 2
Scoreboard - Old The old scoreboard being un-installed
0 0 1
Snack Stand - Finished product! Beautiful new stands for Barrington Little League
0 0 1
Snack Stand - Almost Complete New flooring, fresh drywall, walls, drop ceiling, lighting and electricity the stands are now ready for the counters.
0 0 1
Snack Stand The snack stand was gutted down to the studs and re-wired with new electrical wires
0 0 1
T - Ball field The T-Ball field was cleaned up and tilled.
0 0 1
Snack Stand doors - front view New security gates were installed at Shreve Ave.
0 1 1
Snack Stand Doors - side view Brand new security gates were installed
0 0 1
Quick Connects For both the Majors field and Minors field we installed a "quick connect" which allows managers and coaches to hook up a heavy duty hose and water down the dirt prior to a game.
0 0 1
Majors field stage 3 - base paths The base paths along first and third base were widened on both the Majors field and A minor fields.
0 0 1
Majors field stage 1 Stage 1 of the renovation - complete strip down of the field and infield grass. Preparation for re-grading.
0 0 1
Majors field - stage 1 Stage 1 of the renovation - complete strip down of the field and infield grass. Preparation for re-grading.
0 0 3
Majors field transition level The majors field "Barrington HOP" was leveled out. This was a result of raking towards the outfield for a few years and naturally developed a lip between the infield and outfield.
0 0 35
Majors field stage 3 The majors field has been re-graded and is ready for SOD